Meter changes cause more confusion than almost anything else we deal with. Customers are often surprised that their electrician cannot just swap the meter, and that the wait for it is longer than the install itself. Here is how it actually works in South East Queensland.
The main triggers
Installing solar or a battery. If you still have an old basic meter, it has to go. Solar needs a meter that can measure power flowing in both directions, so your retailer will exchange it for a smart meter. If you already have a smart meter, there is usually no physical change at all. It gets reconfigured to register your feed-in, which happens remotely.
Already have solar? You are fine. If solar was already installed at your place, your meter was sorted when that system went in. Adding a battery, upgrading panels, or replacing an old system does not trigger another meter change. The meter you have can already measure power in both directions, which is all it needs to do. The exception is if the job changes something else on this list, like your supply going from single phase to three phase.
Changing tariffs. Moving to a time-of-use tariff, adding a controlled load, or signing up for an EV charging plan can all require a meter that supports it. Old meters cannot do it, smart meters can.
Upgrading from single phase to three phase. If we upgrade your supply, the meter has to match it. Three phase supply needs a three phase meter.
Switchboard and meter box work. The meter itself belongs to your retailer, but the board and enclosure it sits in belong to you. If your meter panel is asbestos or the enclosure does not meet current standards, that has to be sorted before new metering goes in. That part is electrician work, and it is work we do.
The rollout is coming anyway. Every home and small business in the national grid is required to have a smart meter by 2030, and the pace has picked up through 2026. Even if you change nothing, your retailer can replace an old meter proactively. You will get a notice, and in most cases you cannot opt out.
Who actually does what
This is the part that trips people up. Three different parties touch your power:
Your retailer (who you pay your bill to) owns and arranges the meter. Every meter exchange goes through them, not Energex and not your electrician. Energex owns the poles, wires and the service line to your property. Your electrician is responsible for everything on your side: the switchboard, the meter enclosure, and the wiring.
So when we finish a solar install, we lodge the paperwork, and then the meter exchange sits with your retailer. The rules give them up to 15 business days for a straightforward exchange if no date is agreed, and solar-related meter work commonly runs to around 20 business days depending on the retailer. We tell customers this up front because it is the one part of the job we cannot control.
What it costs
Some retailers do the exchange at no charge, especially under the rollout. Others pass through a cost on your next bill. It varies by retailer and plan, so it is worth asking yours directly before the work starts. Any switchboard or enclosure upgrades on your side are quoted separately, and we tell you before we start whether your board needs anything.
Not Sure If Your Meter Needs Changing?
Send us a photo of your meter board and we will tell you where you stand. Call 0489 077 735.